Bucket Replacements

Boom Replacements

Bucket & Boom Repair

Bucket Liners

Scuff Pads

Bucket Accessories

Guards & Mounting Kits

PCC Parts Catalog

Your one-stop supply center for buckets














Indexed Under: Articulating Boom Lifts

A Field Note: Granted While You Are Mostly Concerned With Articulating Boom Lifts - Yet There Exists Interchange On Making Lift Bucket Repairs And Upgrades Within The Reach Of Any Organization


If case this applies to your operational, safety and maintenance needs, we will take you down a pretty serious and sometimes neglected path for this type of admittedly critical repair. (We hope you find this pertinent, even in your search for Articulating Boom Lifts. If this does not apply to you specifically we would ask that you find someone to give this information to because of its critical safety importance.)

First, There is a need to establish the very basic requirements the for evaluating capabilities of upper boom and lower boom insulators, and what can, in effect, potentially degrade or impede the dielectric performance of the boom itself . There is a basic but established specification that must be consulted.

Articulating Boom Lifts

Second, we move to the physical strength of the entire insulator structure since the primary function of the device is to lift and control aerial loads. Specifically, we are looking at the insulators themselves and how much stress and strain they can withstand over time without breaking down. And the bucket itself, although no standard for insulation exists, and how it can be important to maintain a high level of electrical separation( which is the main reason for the choice of a non-conductive material like fiberglass from which it is fabricated), is still a large part of the safety equation against personal shock. It then becomes even more critical that a three-stage [inspection-repair-inspection] process must also be included. The idea of having a conductive bucket in situations where power line exposure is a potential is not wise, and using a non-conductive personnel enclosure versus a wire or other metalized platform may be the next best thing possible. There are many cases where there is no planned or anticipated potential of actually coming in contact with an unprotected or exposed electrical obstruction, but this can unintentionally happen .

Third, a point of common wear, are the mountings that create a secure Gibralter-like linkage from the bucket to the boom. No slacking here lest a potential decoupling of the lift superstructure - or its crticial support components - occur in the future. (Should your travels have delivered you to this page from your interest in Articulating Boom Lifts, and this does not apply directly to your area of responsibility, express its importance to the correct person in your maintenance or management group.)




So, if you find yourself facing these types of refurbishments, in a competent and emphatically rigorous manner:

  • What the official specifications are for making sure the upper boom is dielectrically separated from the lower boom, and how this separation can be compromised.
  • How strength must be retained in the fiberglass boom insulators, no matter how much working abuse and loads they are subjected to.
  • Sometimes the final line of defense in preventing electrocution is the bucket itself. And, this ability must be checked during any refurbishment.
  • The requirements for correct mounting of the bucket to secure its attachment to the boom..


  • If You Are Already Thinking About Articulating Boom Lifts, Now How About An Effective Evaluation Of Vendor Capabilities


    Given these important considerations, here is a potentially life-saving checklist on aerial lift troubleshooting:
  • Is there any way of verifying that they currently have the full level and type of liability insurance that is specifically underwritten for the risks associated with bucket truck lift repair area?
  • Have the workers been adequately trained and experienced for this type of work, with a bonified record of testing and/or credentials such as those offered by the ACMA?

    In addition to the above:
  • The components in aerial man lift units must perform as life preserving conveyances with high levels of criticality, often beyond other uses for fiberglass. Does this supplier understand this unusual way of applying fiberglass?
  • Insulation continuity can be disturbed by the repair process itself. Therefore a post-check must be performed, again by an approved testing device that itself has been calibrated. This of course presumes that Articulating Boom Lifts-related needs have electrical insulation properties. If you are unsure, the official owners manual is a great place to start checking.


  • Further Than Articulating Boom Lifts: Repair Scenarios And The Right Way To Deal With Them


    Look here to see how this might play out.

    No Obvious Damage


    Your local fiberglass rehab supplier is contacted. Through either shipping or pickup, they are in possession of an upper boom for surface refinishing and rehabilitation. Here are the steps:
    1. The first thing that should be done is to visually examine the boom for any evidence of damage. Any such evidence should be compared with boom damage criteria shown in the OEM manual.
    2. If the boom is dirty inside, the shop should ask permission to pressure wash the inside. After cleaning, the boom should then be dielectrically tested to make sure that it is still dielectrically sound. If there is a dielectric problem, the boom should be analyzed with a conductivity tester to identify the problem. .
    3. If there is nothing else on the repair agenda, the boom should be cosmetically repaired and refinished as needed.
    4. Then, the boom should be dielectrically tested again and structurally tested. If no flaws are found, the boom should be waxed properly to help shed water and dirt, to ensure its insulating effect, and shipped back to the owner. The final phase is creating some type of secure package in which it is placed along with certificates showing the results of the dielectric and structural strength tests.




    Here Is A Time When More Care Is Needed From The Very Beginning, And The Training And Procedures That Call For A Specialist Organization




    The right diagnostic approach:
  • Strip away protective coatings that could in effect form a cover over any type of structural malformations.
  • Internal and external visual and sometimes touch inspection.
  • Check of manufacturer guidelines on returning the component to factory grade.
  • Determination of repair suitability per guidelines.
  • Repair using approved means to increase overall strength and appropriate material adhering properties.
  • Stress testing to required standards.
  • Electrical testing
  • .
  • Putting a protective and visually appealing coating and perhaps identity on.
  • Full package documentation and shipment.


  • When It Is Not Safe To Even Consider Repair


    1. A bucket is received for repair.

    2. This particular design uses bolts to mount it to the arm. One of the studs is coming out of the side wall.

    3. The bucket probably should not be repaired because of concerns about the possibility of the bucket later coming loose from the boom.


    A glimpse into this particular case:

    1. A bucket is received for repair. The aerial platform mounts to the boom via reinforced fiberglass.
    2. An initial examination of the mounting holes in the ribs reveals that there are cracks in the ribs.
    3. The bucket probably should not be repaired

    A fiberglass lift platform comes into this particular shop:

    1. The mount side is not damaged, but the front corners are cracked through. With proper techniques and materials, the bucket can be repaired.

    2. The repairer should determine whether the customer just wants the bucket repaired structurally or wants the bucket to also be refinished to a like-new condition.

    3. A quotation for the cost of the repair should then be given to the customer, and then the appropriate repair action should be taken.

    Tags: Articulating Boom Lifts